1. Official Municipal Provisions & Extracted Requirements
Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
approval for substantial changes to plans ...................... …...25% of original plan review fee, $ 1 0 0 minimum
- All 2 pages of a2gov_building_permit_fees.pdf remediated in-place with ISO 14289-1 (/StructTreeRoot, /ParentTree, /MCID) and WCAG 2.1 AA landmarks.
2. BUILDING PERMIT FEES
Please provide payment information to process the application using the Payment Cover Sheet. Applications received without payment information included cannot be processed.
| Item / Code | Description / Provision | Rate / Contact / Spec | Reference |
|---|---|---|---|
| City Hall: 301 E Huron St. Ann Arbor, MI 48104-6120 Phone | (734) 794-6263 | ext. 0 Fax: (734) 994-8460 | Page 1 |
| (includes all inspections) | per $1000 cost $50,000 – $100,000 | $100 + $10 | Page 1 |
| (includes all inspections) | per $1000 cost $100,000+ | $100 + $9 | Page 1 |
| (includes all inspections) | per $1000 cost $500,000+ | $100 + $8.50 | Page 1 |
| (includes all inspections) | per $1000 cost $1,000,000+ | $100+ $8 | Page 1 |
| (includes all inspections) | per $1000 cost | $100 + $7.50 | Page 1 |
| Each inspection (The Building Official reserves the right to charge for extra inspections) | Page 1 | $35 | Page 1 |
| Special or overtime inspection ( | /hour @ 2 hours minimum) $130 minimum | $65 | Page 1 |
| Historic district staff review (if located in an historic district) | Page 1 | $35 | Page 1 |
| City Hall: 301 E Huron St. Ann Arbor, MI 48104-6120 Phone | (734) 794-6263 | ext. 0 Fax: (734) 994-8460 | Page 2 |
| Above Ground Swimming Pool* | Page 2 | $125 | Page 2 |
| under 200 square feet, includes one inspection | Page 2 | $75 | Page 2 |
3. ACTIVITY
Effective October 2019
Contractor Registration or Re-registration ............................................................................................ $15 Base Application Fee for all permits (non-refundable with no inspections included) ............................. $15
4. Permit Fee – Based on estimated project cost
Est. Project Cost ........................................................................................................ Permit Fee
Up to $1,000 (includes one rough and one final inspection) ........................................................... $100 $1,000 – $50,000
Plan examination fee*........................................................................................ 20% of building permit fee
Trades plan examination fee .......................................................... 25% of Building Plan Examination Fee
Revised plans submitted after initial review and
Fences over 7 feet tall ................................................................................................... building permit fee
Basement waterproofing…. .................................................................................. Same as building permit
(requires Grading Plan Review and Grading Permit based on estimated cost of construction)
Mailing: P.O. Box 8647, Ann Arbor, MI 48107-8647
Site Compliance Permit ...................................................................................................................... $150 Site Compliance Inspection .................................................................................................................. $60
Certificate of Occupancy inspections: Change of Occupancy (Commercial) ..................................................................................... $170 Change of Use ....................................................................................................................... $170 Temporary Certificate of Occupancy or renewal ................................................................................... $30
Demolition: Accessory building ............................................................................. $100* + $10 per $1,000 cost House ................................................................................................ $100* + $10 per $1,000 cost Commercial/Industrial, less than 10,000 square feet .......................... $100* + $10 per $1,000 cost Commercial/Industrial, more than 10,000 square feet ........................ $100* + $10 per $1,000 cost
- Applies to both Commercial and Residential. Excludes Solar Permits; see next page
- Expiration of Permit:A permit remains valid as long as work is progressing and inspections are requested and conducted.1.A permit shall become invalid if the authorized work is not commenced within 180 days after issuance of thepermit or if the authorized work is suspended or abandoned for a period of 180 days after the time ofcommencing the work.2.Any and all permits will be closed when no inspections are requested and conducted within 180 days of the dateof issuance or the date of a previous inspection.