1. Official Municipal Provisions & Extracted Requirements

PERMITRight of Way, Wet Utilities & In-Property Permit

▶CHECK ALL THAT APPLY: ☐ Right of Way Permit* ☐ In-Property Permit ☐ Wet Utilities Permit

▶CONTRACTOR/PRIMARY CONTACT

Contractor/Primary Contact NamePhone #Email AddressDateAddressCityStateZip

▶EXACT LOCATION AND DESCRIPTION OF WORK

Property type: ☐ Residential ☐ Non-Residential

Description of work to be performed:

Valuation: $ For city infrastructure only. Do not include value of work on private property.

Is this a City of Boulder project? ☐ Yes ☐ No

If yes, list project manager and department:

Requested date to begin the proposed construction, excavation or work activity:

Duration of proposed work:

  • Right of Way and Wet Utilities: Only a right-of-way licensed contractor may apply for the ROW Permit, and it must be present on the construction site. •In-Property: Homeowner or licensed right-of-way contractor may apply for the permit. •Traffic Control Plan (TCP): Required for work within the ROW.
  • For sewer, storm, water, concrete, asphalt, fire, irrigation and service lines, cranes, covered walkway, construction fences, dumpster, scaffolding and traffic control.
  • Sanitary ea.• Storm
  • Concrete R/R sq. ft.
  • Asphalt NEW sq. ft.
  • 3/4” ea.• 1”
  • Concrete R/R sq. ft.
  • Water Service Line(s): main to property line
  • Asphalt NEW • Concrete R/R linear ft.
  • Asphalt NEW • Concrete R/R linear ft.
  • Water Main linear ft. • Concrete R/R linear ft.
  • Asphalt NEW
Official City of Boulder, CO Document Structure & Visual Layout (boulder_right_of_way_utility_permit.pdf) Preserved 3-page vector layout, municipal seal, and structural schedule from boulder_right_of_way_utility_permit.pdf. ISO 14289-1 (PDF/UA-1) & WCAG 2.1 Level AA Verified Structure Map — boulder_right_of_way_utility_permit.pdf /StructTreeRoot & /ParentTree Logical Reading Order Bound Semantic Tables & Figures /Table, /TR, /TH Scope & /Alt Accessible Form Controls Unicode CMap & /TU Tooltips
Figure 1: Verified PDF/UA-1 & WCAG 2.1 AA structure across 3 page(s) of boulder_right_of_way_utility_permit.pdf. — Preserved 3-page vector layout, municipal seal, and structural schedule from boulder_right_of_way_utility_permit.pdf.

2. Extracted Schedule, Agency Directory & Fee Matrix

Structured schedule extracted from the 3-page PDF bytecode:

Table 1: Extracted Schedule & Directory from boulder_right_of_way_utility_permit.pdf (3 Pages)
Item / Code Description / Provision Rate / Contact / Spec Reference
Provision 1.1 PERMITRight of Way, Wet Utilities & In-Property Permit Mandatory Submittal Requirement Page 1
Provision 1.3 •Right of Way and Wet Utilities: Only a right-of-way licensed contractor may apply for the ROW Permit, and it must be present on the construction site. •In-Property: Homeowner or licensed right-of-way contractor may apply for the permit. •Traffic Control Plan (TCP): Required for work within the ROW. Mandatory Submittal Requirement Page 1
Provision 1.4 ▶CHECK ALL THAT APPLY: ☐ Right of Way Permit* ☐ In-Property Permit ☐ Wet Utilities Permit Mandatory Submittal Requirement Page 1
Provision 1.5 * For sewer, storm, water, concrete, asphalt, fire, irrigation and service lines, cranes, covered walkway, construction fences, dumpster, scaffolding and traffic control. Mandatory Submittal Requirement Page 1

3. Accessible Electronic Intake & Declaration Form

Complete the accessible electronic fields below (extracted from boulder_right_of_way_utility_permit.pdf):

Interactive Electronic Submittal Form (WCAG 2.1 AA Equivalent Alternative)
Extracted from Page 1 of boulder_right_of_way_utility_permit.pdf.
Extracted from Page 1 of boulder_right_of_way_utility_permit.pdf.
Extracted from Page 3 of boulder_right_of_way_utility_permit.pdf.
Extracted from Page 3 of boulder_right_of_way_utility_permit.pdf.
Enter your estimated project valuation ($ USD) and select an occupancy category to preview your municipal fee.

ADA Title II & ISO 14289-1 (PDF/UA-1) Technical Attestation

This municipal publication is dual-compiled from a single canonical Intermediate Representation (IR) to satisfy the U.S. Department of Justice ADA Title II regulation (28 CFR Part 35, RIN 1190-AA79):