1. Official Municipal Provisions & Extracted Requirements
PERMITRight of Way, Wet Utilities & In-Property Permit
▶CHECK ALL THAT APPLY: ☐ Right of Way Permit* ☐ In-Property Permit ☐ Wet Utilities Permit
▶CONTRACTOR/PRIMARY CONTACT
Contractor/Primary Contact NamePhone #Email AddressDateAddressCityStateZip
▶EXACT LOCATION AND DESCRIPTION OF WORK
Property type: ☐ Residential ☐ Non-Residential
Description of work to be performed:
Valuation: $ For city infrastructure only. Do not include value of work on private property.
Is this a City of Boulder project? ☐ Yes ☐ No
If yes, list project manager and department:
Requested date to begin the proposed construction, excavation or work activity:
Duration of proposed work:
- Right of Way and Wet Utilities: Only a right-of-way licensed contractor may apply for the ROW Permit, and it must be present on the construction site. •In-Property: Homeowner or licensed right-of-way contractor may apply for the permit. •Traffic Control Plan (TCP): Required for work within the ROW.
- For sewer, storm, water, concrete, asphalt, fire, irrigation and service lines, cranes, covered walkway, construction fences, dumpster, scaffolding and traffic control.
- Sanitary ea.• Storm
- Concrete R/R sq. ft.
- Asphalt NEW sq. ft.
- 3/4” ea.• 1”
- Concrete R/R sq. ft.
- Water Service Line(s): main to property line
- Asphalt NEW • Concrete R/R linear ft.
- Asphalt NEW • Concrete R/R linear ft.
- Water Main linear ft. • Concrete R/R linear ft.
- Asphalt NEW
2. Extracted Schedule, Agency Directory & Fee Matrix
Structured schedule extracted from the 3-page PDF bytecode:
| Item / Code | Description / Provision | Rate / Contact / Spec | Reference |
|---|---|---|---|
| Provision 1.1 | PERMITRight of Way, Wet Utilities & In-Property Permit | Mandatory Submittal Requirement | Page 1 |
| Provision 1.3 | •Right of Way and Wet Utilities: Only a right-of-way licensed contractor may apply for the ROW Permit, and it must be present on the construction site. •In-Property: Homeowner or licensed right-of-way contractor may apply for the permit. •Traffic Control Plan (TCP): Required for work within the ROW. | Mandatory Submittal Requirement | Page 1 |
| Provision 1.4 | ▶CHECK ALL THAT APPLY: ☐ Right of Way Permit* ☐ In-Property Permit ☐ Wet Utilities Permit | Mandatory Submittal Requirement | Page 1 |
| Provision 1.5 | * For sewer, storm, water, concrete, asphalt, fire, irrigation and service lines, cranes, covered walkway, construction fences, dumpster, scaffolding and traffic control. | Mandatory Submittal Requirement | Page 1 |
3. Accessible Electronic Intake & Declaration Form